Bathroom fitting
A full bathroom stripped out and fitted, with a written plan first.
Time on site: 4 to 7 days.
What is included
- A written plan and a fixed price before we start
- Stripping out the old suite and tiles
- Fitting the new suite, shower, taps and waste pipes
What is not included
Tiling, electrical work and decoration are done by trades we can arrange, at their own price.
What it costs
We give you the price for this job from our price list, and we confirm it with you before we start. Every price we quote is shown without VAT.
Download the price list (PDF, 1 page)
How we work
When you ask for bathroom fitting, we start by asking a few questions about the problem, the age of the equipment and how easily we can reach it. That helps us send the right engineer with the right parts, so the job is more likely to be finished on the first visit.
On the day, the engineer explains what they have found before they start, tells you the price in plain words and waits for your yes. If the job turns out to be bigger than we thought, we stop, explain why and give you a new price. We never carry on and send a bigger bill afterwards.
When the work is done we test it, clear up and show you what we did. You get a written receipt that shows the price without VAT, the VAT on its own line, and the total.
Booking
Ask for a home visit and we will measure up and talk through the plan with you.